Insights

Industry insights on robot applications, automation and selection — field notes from the Yigaite engineering team.

Sourcing a BRTIRSC0603A Four-Axis Robot for Small-Part Pick-and-Place and Machine Loading
Buying Guide

Sourcing a BRTIRSC0603A Four-Axis Robot for Small-Part Pick-and-Place and Machine Loading

A practical sourcing guide for engineers evaluating the BRTIRSC0603A compact four-axis robot in small-part pick-and-place and machine-tending cells — covering reach and payload checks, cycle-time fit, gripper and fixture interfaces, and the integration questions worth answering before you commit.

2026-09-23T01:00:01Z
Ultrasonic Sprue Cutting, Counting & Cavity Sorting Cells with BRTIRUS0805A: A Sourcing Guide for Injection Molding Buyers
Buying Guide

Ultrasonic Sprue Cutting, Counting & Cavity Sorting Cells with BRTIRUS0805A: A Sourcing Guide for Injection Molding Buyers

A practical sourcing guide for injection molding teams evaluating robotic ultrasonic degating cells — covering cycle-time targets, degating quality checks, cavity-level counting and sorting, acceptance criteria, and how to specify a cell around a 5 kg / 990 mm reach six-axis platform such as the BRTIRUS0805A.

2026-09-21T01:00:01Z
Specifying Robot End-of-Arm Tooling and Gripper Interfaces for Insert Molding, Nut Embedding, and Sprue Picking Cells
Buying Guide

Specifying Robot End-of-Arm Tooling and Gripper Interfaces for Insert Molding, Nut Embedding, and Sprue Picking Cells

A practical specification guide for injection molding engineers and automation integrators selecting end-of-arm tooling (EOAT) and gripper interfaces for insert molding, nut embedding, and sprue picking cells — covering payload budgeting, vacuum vs. mechanical gripping, interface standards, part-present verification, and mold-area integration logic.

2026-09-19T01:00:36Z
How to Specify a Robot Cell for Glue Insertion and Insert Molding: An FAQ Guide for Injection Molding Engineers
Buying Guide

How to Specify a Robot Cell for Glue Insertion and Insert Molding: An FAQ Guide for Injection Molding Engineers

A practical specification guide for engineers planning glue insertion and insert molding cells — covering payload and reach calculations, mold interface and cycle-time logic, part-presentation and insertion accuracy, plus a reference configuration using the BRTIRUS1510A in an eight-cavity toothbrush overmolding cell.

2026-09-16T01:00:01Z
Robot CNC Machine Tending for High-Mix Low-Volume Shops: 4-Axis vs 6-Axis, One-to-One vs One-to-Three
Buying Guide

Robot CNC Machine Tending for High-Mix Low-Volume Shops: 4-Axis vs 6-Axis, One-to-One vs One-to-Three

A practical buying guide for high-mix low-volume machine shops evaluating robot CNC tending — covering one-robot-to-three-machine layouts, bar stock feeding, and how to choose between a 4-axis model like the BRTIRPZ1508A and a 6-axis model like the BRTIRUS1510A.

2026-09-14T01:00:01Z
4-Axis vs. 6-Axis Robots for Press Brake Tending: How to Choose the Right Automation
Buying Guide

4-Axis vs. 6-Axis Robots for Press Brake Tending: How to Choose the Right Automation

Choosing between a 4-axis and a 6-axis robot for press brake tending depends on your parts, die setup, and workflow complexity. This guide compares the two architectures—using the BRTIRPZ1508A and BRTIRUS1820A as benchmarks—to help you match the right robot to your bending application.

2026-09-11T01:00:01Z
Robot Welding Automation: A Practical Guide
welding

Robot Welding Automation: A Practical Guide

How to automate arc and spot welding with 6-axis robots — cell layout, positioners, seam tracking, cycle time and a realistic ROI view.

Aug 20, 2026
Robot Palletizing: Stack More, Lift Less
palletizing

Robot Palletizing: Stack More, Lift Less

Automating end-of-line palletizing with robots — payload and gripper choice, cases per minute, pallet patterns and a realistic payback view.

Aug 18, 2026
Robot Machine Tending: Keep the Spindle Running
machine tending

Robot Machine Tending: Keep the Spindle Running

How robot machine tending raises CNC spindle uptime — reach, payload, dual grippers, part presentation and lights-out shifts.

Aug 16, 2026